Epic performed design and construction of a 12,000 gpm booster pump station for Orem City. The design includes 1,800 sf masonry building, vertical turbine pumps, site layout, and coordination with tank and well projects. The project also includes the design and construction of 1,400 feet of 24-inch ductile iron culinary water pipe, 1,160 feet of 24-inch HDPE culinary water pipe, and 1,340 feet of 30-inch HDPE stormwater pipe for Orem City. The design includes culinary water tie-over, service lateral tie-overs, manholes, valves, and fittings. The project is currently under construction.