Spanish Fork Canyon Pipeline - Mapleton Reach

Epic Engineering’s Construction Management team oversaw the Central Utah Water Conservancy District’s Mapleton Reach pipeline project, which consisted of constructing approximately 5 miles of 60" diameter underground steel water pipeline along state highway 6. Our team provided field and laboratory material testing services for the contractor. Our services included testing of soils, aggregate, controlled low strength material (CLSM), concrete, and asphalt. Our design team was also brought in to assist with the CLSM mix design, and dewatering plan design.