Hydrologic Analysis of Provo River & Jordan Dam

Epic Engineering’s team of engineers performed a full hydrologic analysis of the Provo River for the construction of the Jordan River dam.  Our hydrologic analysis included channel relocation, runoff water quality and discharge treatment and control, the efficacy of energy dissipaters and high velocity rip-rap for erosion control.  Our analysis also considered access roads and their effects to the site.