Epic Engineering designed a 36-inch O.D. HDPE reuse pipeline with a flow of 9,000 GPM. The line is 13,400 linear feet from the Jordan Basin Water Reclamation Facility to Draper Irrigation’s pressure irrigation system in Draper, UT. Design challenges included crossing the Jordan River, railways (UTA and Union Pacific), and the I-15 corridor. The project also included the transition to ductile iron pipe, direction bore, and casing installation.