Flaming Gorge Floating Sanitation Station

Epic Engineering undertook the design and oversaw the construction of a floating sanitation station, with both men’s and women’s, ADA compliant restrooms. This sanitary sewer system included on station and on shore collection tanks, a pumping system, and 300 feet of flexible sewer line. Epic Engineering’s skilled team of designers also designed the electrical plan, floatation devices and barge platform according to all applicable codes and industry standards.