Secondary Water Pump Station Upgrade

Epic Engineering’s Civil Engineers and MEP Engineers designed the upgrades to five existing pump stations, and designed one entirely new pump station in Riverton City, Utah. These upgrades and designs were for a city-wide secondary water system upgrade. The upgrades included installation of new piping, valves, headers, pumps and motors, self-cleaning small micron filteration systems, electrical switch gear, HVAC, electrical and instrumentation.